in-depth layout across the country to take full advantage of rich big data resources
b
four advantages of management team
manage projects more professionally, which include civil engineering project manager and electrical project manager
more than 80% of the project managers have the national registered constructor certificate of level 1
ensure backup and delivery on time and quality
mains electricity, submission for construction approval and government relationship belong to engineering center, and ensure the synchronous promotion within and beyond boundary line
data center management ability
02
multi-project parallelism ability
parallel ability of 20 or more large-scale projects with well-controlled process
cost control ability
standardize reproducible management methods, and conduct quick copy to new project
ability to deliver on time and quality
the ability to deliver on time and quality leads the industry
smooth and rapid project replication ability
control modifications within a controllable range in whole process
data center management methods
03
with the past 9 years of data center construction, shanghai at hub corporation keeps on summarizing and optimizing management methods in project implementation progress. a set of standardized management methods have been formed from the initial continuous encounter with problems at the beginning to each subsequent project review and targeted solution of the problems encountered. these standardized management methods include:
drawing examination standardization
standardization of division of labor interface
construction schedule plan standardization
on-site management standardization
organizational structure standardization
detail disclosure standardization
data center classic case
01
@hub baoshan data center
@hub zhangbei data center
@hub shenzhen baolong profit creation project
@hub baoshan data center
awarded “the first national green data center”by the department of energy conservation and comprehensive utilization, miit
@hub zhangbei data center
the first data center to use clean energy on a large scale in asia. set a successful example for the international green cloud computing infrastructure industry
@hub shenzhen baolong
profit creation project,@hub has set a 75-day delivery record